Project Information:
Jurong Port Terminal Project – JPTT (Located at Jurong Port Road)
Based on site requirement, we design and erect heavy duty loading scaffold access of the Tank’s internal and external to use for blasting & painting.
Material used: Tubulars and Ringlock system.
Brief introduction of the project:
Jurong Port Tank Terminals Pte Ltd is a 60:40 joint venture between Jurong Port Pte Ltd and Oiltanking GmbH, which will be located in Pulau Damar Laut in Jurong Port.
Designed to store and handle both clean petroleum products and petrochemicals, the liquid bulk terminal will have a total capacity of estimated 480,000m³. The new tank terminal is well-positioned for synergy building and operational efficiencies that would be seamlessly connected by pipelines and integrated into the petroleum and petrochemical network on Jurong Island. The dedicated terminal will cater to customers who wish to have limited sharing of systems with other customers, and yet have access to trade with other players.